
Planning moves ahead, and choosing where to operate
A predictive controller plans its next moves against a model and its limits; an optimizer decides which target is worth reaching. Eleven plants show where each earns its complexity and where simpler control is enough.
pages 1–21
Hot-Air Balloon Altitude and Landing · pages 22–48
A hot-air balloon answers its burner four seconds late and then integrates twice on the way to the altitude, so there is no steady state from which to read a gain. What can one loop, a cascade and a step-response predictive controller do with such a plant, and what does it take to land it under a touchdown-speed limit?
Friction Stir Welding · pages 49–75
A step test in quasi-steady welding returns a gain 1.7 times smaller and a time constant ten times longer than the same test through the plunge of the same weld. Which test should fill the dynamic matrix, and what does the wrong regime cost in millimeters of defect?
Drum Boiler and Turbine Coordinated Control · pages 76–97
A drum boiler stores energy in its saturated water and steel, so the turbine valve can deliver megawatts within seconds by drawing down a pressure that only the fuel can restore. Who should repay that loan, and what must a predictive controller know about a fuel it cannot measure to hold its setpoint and its pressure limit?
Irrigation Canal Reach Control · pages 98–124
Each reach of an irrigation canal stores water, delays every change by a gravity wave's travel time and rings at the wave's round trip. Which gate should answer to which level, how hard can its loop be tuned, and what is a published order, or one plan for every gate, worth against feedback?
District Heating Network · pages 125–148
In a heat network the flow the consumers draw sets the transport delay, so heat sent ahead of a morning peak arrives when the valves allow. When does sending heat ahead pay, and can a posted price of heat coordinate a plant and six consumers as well as one central plan, even when the plant runs short?
Reservoir Operation and Flood Control · pages 149–171
A reservoir empties its flood pool only as fast as the channel below the dam carries water, so it must release days before a storm, on a forecast that sometimes promises a storm that never comes. What do a rule curve, a value-function policy and a scenario tree each cost and buy in flood safety, supply and energy?
Data Center Cooling and Water Optimizer · pages 172–201
A loop that holds the server inlet at its setpoint says nothing about what the hall costs, because the chilled water setpoint and the tower's evaporative fraction beneath it decide the electricity and the water. Where does the cheapest operating point that meets every limit sit, what holds it there as the wet bulb moves, and does a predictive layer on the same cost find a better one?
Commercial Building HVAC and Demand Response · pages 202–233
An office is judged against a comfort band, so the setpoint inside it is free and the concrete behind it stores cooling. How should a controller spend that freedom against a tariff, a forecast and a curtailment, and what does a day-ahead plan add to a priced rule?
Wastewater Aeration and Nutrient Removal · pages 234–264
An activated sludge plant is judged on an eight-hour mean of effluent ammonia that answers the air in about three hours, while its control system holds a dissolved oxygen setpoint that appears in no permit. Where should that setpoint sit hour by hour, and what is moving it worth at equal compliance, on the first day and on a settled day?
Water Distribution Pumping and Pressure · pages 265–286
A town's pumps are on or off, its tank is the only store, and the same tank level and valve settings decide the pumping bill, the pressure at the highest house and the water lost through leaks. When should the pumps run, and what does an integer schedule re-solved every hour add to a level band and to pressure management?
Automatic Train Operation · pages 287–310
An electric train due at the next platform at a set time can spend its spare seconds on speed or on coasting. Where should the force change along the run so that the train arrives on time with the least energy, and what does a plan need from the loop that tracks it?
pages 311–325