
Tuning, anti-windup and implementation that works on real loops
Most industrial loops are PID loops, and most of the difficulty is in the details. Eleven plants, from cruise control to a servo axis, show how to choose the algorithm form, tune it, filter it and keep it from winding up.
pages 1–23
Vehicle Speed Control Studio · pages 24–54
Aerodynamic drag grows with the square of road speed, so the process gain and the time constant of a cruise control loop both fall as the car goes faster. What does a step test at one cruise speed predict about the loop at another, and what does a velocity-form PID do when the pedal reaches its stop?
Blending Tank Control Studio · pages 55–86
A blending loop manipulates a feed concentration that is bounded by what the upstream supply contains. Which standing errors can a controller remove, and at what dilution flow does a composition setpoint pass out of reach of any tuning?
Heat Exchanger Control · pages 87–118
The constants of a steam-heated exchanger are hidden, and its outlet temperature loop has a dead time and a gain that both move with the feed rate. What does one valve step test identify on such a plant, and how far can a tuning rule be trusted with the three numbers it returns?
Cooling Tower Makeup Water Control · pages 119–146
A cooling tower basin loses water by evaporation, blowdown and drift, and none of the three depends on the level, so the level ramps where a drained tank would settle. What does a step test measure on such a plant, and how do its two numbers become a controller that neither cycles nor wears out the makeup valve?
pH Neutralization · pages 147–170
A discharge permit of pH 6 to 9 occupies 0.155 % of the reagent valve's travel, and the gain from valve to pH changes by four orders of magnitude across one stroke. When does such a loop need a different structure instead of a better tuning, and which structure repairs which defect?
TCP Internet Congestion Control · pages 171–195
A router that marks packets to hold its queue acts on senders that learn of each mark one round trip later, and that round trip grows with the queue being held. At what round-trip time does a fixed PI tuning lose its phase margin, and does the simulated loop stop settling where the characteristic equation says it should?
Freeway Ramp Metering · pages 196–223
A freeway merge passes the most traffic just before it breaks down, and the queue it then forms discharges a tenth less until it is gone. How far below that fold should an integral controller hold the merge, and what happens when the ramp storage that pays for the margin runs out?
Ride-Hailing Surge Pricing · pages 224–246
A surge multiplier reaches riders at once and drivers only through their earnings, and past the fold of its throughput map a zone completes fewer trips as demand grows. When does a feedback price keep the zone on the near side of that fold, and when do a slow decision calendar, a price cap or the controller's own logic let it cross?
Fiscal Stabilization and Public Debt · pages 247–271
A treasury decides its budget once a year on late figures, spends it the year after, and adds every deficit to a debt whose ratio to output has dynamics of its own. How much feedback do those lags and that calendar allow, and what does holding output up cost the debt?
Central Bank Policy Rate and Inflation Targeting · pages 272–296
A central bank moves one rate eight times a year in quarter-point steps, on statistics published late, and the economy answers in output a year later and in prices two years later. Which way of deciding holds inflation near its target through those lags, and what do the calendar, the quantum and the lower bound cost it?
Servo Drive and Flexible Axis · pages 297–327
A servo motor drives a machine table through a flexible coupling and a gear pair with a gap. What caps the gain of its speed loop, what can a motor encoder not see, and what does a relay autotuner measure on such an axis?
pages 328–341