FDELAY - APMonitor Option
Main.OptionFdelay History
Hide minor edits - Show changes to output
Changed line 5 from:
%width=50px%Attach:cv.png
to:
%width=50px%Attach:cv.png [[Main/DbsVariable|Local Options]] | %width=30px%Attach:apm.png [[Main/DbsGlobal|Global Options]]
Changed lines 9-11 from:
Description: Feedback delay: 0=No Delay, >=1 horizon steps for delay
to:
Description: Feedback delay
0=No Delay
>=1 horizon steps for delay
0=No Delay
>=1 horizon steps for delay
Added lines 1-11:
(:title FDELAY - APMonitor Option:)
(:keywords FDELAY, Optimization, Estimation, Option, Configure, Default, Description:)
(:description Feedback delay: 0=No Delay, >=1 horizon steps for delay:)
%width=50px%Attach:cv.png
Type: Integer, Input
Default Value: 0
Description: Feedback delay: 0=No Delay, >=1 horizon steps for delay
The feedback delay places the measurement at the appropriate point in the horizon for dynamic estimation. Typical examples are laboratory measurement or gas chromatographs that report measurements that were taken in the past, usually with a 10 min - 2 hour delay. When the new value is reported, it should be placed at the appropriate point in the data time horizon. FDELAY is the number of horizon steps in the past where the measurement was actually taken.
(:keywords FDELAY, Optimization, Estimation, Option, Configure, Default, Description:)
(:description Feedback delay: 0=No Delay, >=1 horizon steps for delay:)
%width=50px%Attach:cv.png
Type: Integer, Input
Default Value: 0
Description: Feedback delay: 0=No Delay, >=1 horizon steps for delay
The feedback delay places the measurement at the appropriate point in the horizon for dynamic estimation. Typical examples are laboratory measurement or gas chromatographs that report measurements that were taken in the past, usually with a 10 min - 2 hour delay. When the new value is reported, it should be placed at the appropriate point in the data time horizon. FDELAY is the number of horizon steps in the past where the measurement was actually taken.